[Blueboard] Rizal Library arrangements, July 18-22

Vernon R. Totanes vtotanes at ateneo.edu
Fri Jul 18 09:34:06 PHT 2014


As the most recent Meralco update promised, rotational manual load dropping
began today, July 18, 9:00am, with an estimated average duration of 4
hours. This situation, it is hoped, will end by July 22, at the latest. The
following arrangements, therefore, will be followed whenever power is
unavailable:

   - The New Building, Special Collections Building, and Matteo Ricci Hall
   will remain open, but CTC 101 will be closed. Due to the lack of power,
   only the New Building's first floor will be fully operational.
   - Books from the 3rd and 4th floors may be perused at the Reference
   Section, while books and other materials from the Special Collections
   Building (except for the American Historical Collection) may be requested
   at the Reserve Section.
   - Computers at the Reference and Reserve Sections may be used by all
   faculty and students. The Information Commons will be closed, but printing
   services will be available at the Circulation Desk.

Please bear with us.


Von

=====

Vernon R. Totanes, PhD
Director, Rizal Library
Ateneo de Manila University
Loyola Heights, Quezon City
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://lists.ateneo.edu/pipermail/blueboard/attachments/20140718/39db2537/attachment.html 


More information about the Blueboard mailing list