SITUATION REPORT
(Monday, 29 June 2009)

The Situation Report of 29 June 2009, with relevant photos, is posted at
 http://www.ateneo.edu/index.php?p=120&type=2&sec=26&aid=6919

   
It may also be downloaded as a Word file from
http://www.ateneo.edu/upp/sitrep_doc/Sitrep_290609.doc



POWER:  UPP electricians corrected the single phasing at the Barangka grid
from 8:00 to 8:30 this morning.  No equipment was reported damaged due to
single phasing.

The pole near San Jose Seminary is where one of the three cut-out fuses for
the high tension cables was detached.  UPP electricians are shown checking
the cut-out fuse before reconnecting it.

San Jose Seminary reported a leak in the waterline yesterday.  This could
not be acted on yesterday (Sunday) and the gate valve was closed.  UPP
plumbers repaired the leak early this morning and restored water supply to
San Jose Seminary.

TRAFFIC:  Since the opening of the U-turn south of the Gate 2.5 footbridge,
Gate 3 has become the most preferred gate from 6:00 to 8:00 a.m.  The number
of vehicles entering the campus at Gate 1, Gate 2 and Gate 3 was being
counted by UPP personnel from 5:30 to 8:00 a.m. since last week.

Gate 1 was closed since Wednesday to Friday (on Wednesday & Thursday due to
bad weather and on Friday because the Grade School had no classes). 

If the trend continues, approximately 5,000+ vehicles enter the campus from
5:30 to 8:00 a.m. from Monday to Friday.  Gate 3 is the preferred gate
followed by Gate 1.  Gate 2 is not as accessible due to the volume of
vehicles entering Gate 1.

Monday is not a typical day for traffic as Miriam College has no classes for
college.  

Those who wish to avoid the morning traffic are encouraged to come before or
after the morning rush period.

Tuesday, 23 June downpour:

Heavy rain last Tuesday afternoon, 23 June from 2:50 p.m. to 3:40 p.m.
flooded sections of Katipunan Avenue and slowed down traffic on the
northbound lane.  Flood water under the Gate 2.5 footbridge along Katipunan
drained after 20 minutes.

On campus on the same day, strong winds and heavy downpour uprooted some
trees and broke branches near the Blue Eagle Gym, at the High School Covered
Courts, Cervini Residence Hall and the old Communications Arts Department
building.  

Those that blocked roads were immediately cleared by UPP personnel with the
assistance of personnel of JSA, the ground maintenance contractor.  

Vehicular Accidents:  For the month of June (as of today), there have been
11 minor vehicular accidents on campus and 5 reported accidents along
Katipunan Avenue.  The most recent were:

Saturday, 27 Jun:  A speeding northbound motorcyclist lost control of his
motorcycle at the foot of the flyover and smashed into the concrete
railings.  Barangay Loyola Heights Emergency Rescue came to assist the
victim and brought him to the hospital.  

Sunday, 28 Jun:  A High School parent about to attend the freshmen parent
orientation at the High School was hit by a speeding southbound boom truck
at the Gate 2.5 U-turn.  She was slightly injured and was rushed to the
Qurino Memorial Medical Center.  She only suffered a minor head cut but her
car was badly damaged at the rear.

Planned relocation of U-turn:  To improve traffic flow on Katipunan, MMDA
will relocate the U-turn in front of Miriam College's Gate 1 closer to the
footbridge (specifically in front of Metro Bank) shown in the map below:  

MMDA personnel shown in the first three pictures breaking and clearing the
island.  Next three pictures show the same area with concrete.

GATE PASS STICKERS:  The community is reminded that tomorrow, 30 June is the
last day for issuance of the 2009-2010 gate pass stickers without the P1,000
surcharge.   Please get your stickers now.

SECURITY:  There are still items left unattended but fortunately they are
found and returned.

Friday, 26 Jun:  SG TEDDY D BERNABE, found a car at the Upper East carpark
with the back door unlocked with the car key left in the ignition switch.
In the presence of the supervisor, the car was locked.
Saturday, 27 Jun:  SG LEO MADRIQUERA found a laptop at the MVP Colayco
Pavilion.  This was claimed by the owner in the evening of the same day at
the security office.

The road to the University Dormitory, Cervini & Eliazo Residence Halls were
paved with asphalt last Saturday.  Painting of the traffic lines will be
done next weekend.

Road patching at the Gonzaga carpark was also done over the weekend.  

Excess asphalt materials were used to patch up cracks along Seminary Drive
between the College Covered Courts and the old Communication Arts building. 

ldm290609

Please email comments to iescuadro at ateneo.edu


Visit the University Physical Plant website at
http://www.ateneo.edu/index.php?p=472

    
 

__________ Information from ESET NOD32 Antivirus, version of virus signature
database 4194 (20090628) __________

The message was checked by ESET NOD32 Antivirus.

http://www.eset.com
 




More information about the Blueboard mailing list