PEDESTRIAN FOOTBRIDGE BULLETIN
Saturday, 12 August 2006

 

The pedestrian footbridge under construction  near Gate 3.5 was hit by a speeding trailer truck carrying a backhoe at 10:10 last Thursday night, 10 August.  The impact bent the trusses and detached a 2.5-meter intermediate steel beam that fell on Katipunan.  Fortunately no vehicle was hit.  The trailer truck sped away to avoid apprehension.

 

At 9:51 of Friday morning, 11 August a speeding container truck hit and severely damaged the pedestrian footbridge.   Pictures of the incidents are shown below:

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

Pictures showing damage caused by the trailer-truck carrying a back hoe.  Note missing intermediate beam in picture on the right. 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

9:51 a.m. Friday, 11 August  Pictures show the container truck stuck under the footbridge after hitting it.  The footbridge would have collapsed if the container truck had backed up. 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

Pictures showing the damage done to the footbridge.  Note the detached trusses and intermediate beam.


Left: The contractor's crane at the scene at 12:12 p.m.  The crane was set up on the southbound lane.  

Center: 12:30 p.m.:  The MMDA crane occupied the road to Gate 3.5 when it was closed to traffic.  

Right:  Workers started detaching the trusses from the columns using an acetylene torch. 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

The removal of the trusses one after the other.  The first trusses had to be lowered on the road blocking traffic for 15 minutes. 



click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

 

The first of the two trusses being moved to the construction staging side inside Ateneo.

 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

 

Removal of the second truss.  Middle picture shows the damage to the columns on the center island. 

 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

 

Removal of the trusses and transfer to the staging area inside Ateneo.



click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

 

These pictures were taken on the morning of Saturday, 12 August.  Note the damaged trusses and columns in the center island have been removed by the contractor.

 

click here to view picture http://www.admu.edu.ph/upp/situation_report/sb120806.htm

 

The sketch of the pedestrian footbridge near Gate 2.5 above shows the vertical clearance in meters and feet.  Note that the center clearance is 4.938 meters or 16.21 feet.  The center clearance of the footbridge at Gate 3.5 was measured at 4.27 meters or 14.01 feet.  The container carried by the truck that hit the footbridge was measured at 4.30 meters or 14.11 feet.  The minimum standard clearance is 4.27 meters or 14.01 feet.

 

The bad news is that the footbridge will not be ready for use on Saturday, 19 August 2006.  The contractor promised to inform Ateneo when it will be in place.    

 

The community should be thankful that the deficiencies of the footbridge were found now and not later, which could cause injuries.  Traffic on campus and Katipunan should be back to normal.





 

ldm120806  

 

Please email comments to uppa at admu.edu.ph 

Traffic Bulletin of 12 August 2006 is also posted at http://www.admu.edu.ph/upp/advisory.htm  

-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://lists.ateneo.edu/pipermail/blueboard/attachments/20060812/1b6a7ce2/attachment.html 


More information about the Blueboard mailing list